Zofiówka Thermal Electric Power Station

High Pressure Regeneration Preheaters  PWU-150/125-5-300 (TG1)  and PWU-150/125-551-300 (TG2) with new system of pipelines in heaters area space.

These preheaters are high pressures, regenerations, superficials, trizones, U-tubes heat exchangers of perpendicular type.

They are high pressure unit of feed water heater in turbine sets systems TG32 No1 and 2 in “Zofiówka”  Thermal-Electric Power Station.

Heating factor it is steam from turbine tapping  point and condensate from this steam.

Every heater consist from property heater and cooler of condensate.

Property heater has constructional isolated zone for heat exchange in cycle of superheated steam and condensate zone.

Water chamber with tube system and steam chamber made heater all-welded and irreducible.

Basic parameters:

- absolute surface of heat exchange              150 m 2

- maximum quantity of heater changed        6,34 MW

- calculation hypertension:

                       water space                            21,0 MPa

                       steam space                            3,5 MPa

- Calculation temperature                         

                       water space                             240 oC

                       steam space                             350 oC

 

Contractor of heat exchanger: Energoremont – Krasnystaw – on CBKK S.A. documentation.

Orderer : Energomontaż – Południe S.A. o/Łaziska Górne

Start up : 2009 year.